HomeMy WebLinkAbout2005-Building (elevator)
e,
O$cHKOSH
ON THE WATER
Job Address 1449W4THAVE
CITY OF OSHKOSH
BUILDING PERMIT -APPLICATION AND RECORD
No
116218
Owner MRiMRS ROBERT WHITE REV TRUST
Create Date
09/09/2005
Designer
Contractor
PORTSIDE BUILDERS, INC.
Category
111 - Single Family Addition
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
R
Class of Const: VB
Size 5'-6" x 6'-5"
Unfinished/Basement
----..2 Sq. Ft.
----..2 Sq. Ft.
Rooms
0
Height
0 Ft.
0 Projection I
Canopies
Finished/Living
Bedrooms
Stories 2
Garage
----..2 Sq. Ft.
Baths
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Required
Flood Plain No
Height Permit Not Required
Not Required
# Dwelling Units -----.!!
# Structures
-----.!!
Park Dedication
Use/Nature pFRI Elevator addition as per plans - Natural light requirement to be met when windows are removed. Ail loads must properly transfer.
ofWork
Plumbing Contractor
HVAC Contractor
Electric Contractor
$16,900.00 Plan Approval
$50.00 Permit Fee Paid
$119.00 Park Dedication
$0.00 .
Fees: Valuation
Issued By:
Date 09/09/2005
Final/O.P, 00/00/0000
0 Permit Voided I
Parcelld # 0611690000
In the performance of this work I agree to perform all work pursuant to ruies governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a pany, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 980 AMERICAN DR
Agent/Owner
NEENAH
WI 54956 - 0000
Telephone Number
920-727-4874
To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
oJ
?
«
:Ç
:T
'()
N
~ 1\
-:2
~
':t-
':t-
~~
~;;;:::;
;::/
I
:::::~
~,~
~ì
I
BAC~<
I
I
-,
I
I
I
I
3'
----'
I I
I I
I I
I 1
I
I
I I
I I
I 2'..8" I
, I
i -0-1
-<
, I
I I
I I
I I
I I
I I
I
I
I
I
I
I
, L---
' -1------- -
"- -----------
L_L___-
=~-------------------
- --
--.
-
--
-
-
-
-
-----
1
-1 '1/4"
-.
I
I
~
I
L- -
r-
r
- l
I
I
I
I
I
J
'\7""""
I I
I I I
I I I I
I I I I
I I I I
I I I I
I I I I
I I I
I I I I
I I I I
I I I I
I I I I
I I
' , "
I 1
1 I
' -
' , " -
' , " - -.. -
' , "__un- --
' , 'L----u --..
: : -----_L----_- ---------
L_L_____- ------------
r-- ------------
I_. - - -. 0'- -
-----