Loading...
HomeMy WebLinkAbout0116201 P 0 OSHKOSH ON THE WATER Job Address 2593 VILLAGE LN CITY OF OSHKOSH PLUMBING PERMIT. APPLICATION AND RECORD No 116201 Contractor D R GLAZE PLUMBING Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures 0 0 0 0 0 1 0 0 0 0 Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind 0 0 0 0 0 0 0 0 0 Water Softner Local Waste Clothes Wshr Bidet Beer Tap Lab Sink Owner ERIC B/MARIL YN WILSON Create Date 09/08l2005 Category 410 - Residential-Interior Plan 0 0 0 0 0 0 0 0 0 WaitSt Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink 0 Shamp Sink ----2 0 FlrlWst Sink 0 0 Catch Basin 0 0 Wash Ftn 0 0 Urinal 0 0 Standp Rec 0 0 Ice Maker 0 0 Gar Drain 0 0 Soda Disp 0 Coffee Maker 0 Int Grease Trap ----2 Ext Grease Trap ----2 RPZ Valve 0 Eye Wash Statn 0 WtrSewerMtrs 0 Deduct Meters 0 Wtr Usage Mtrs 0 Sterilizer Dip Well Drink Ftn UseJNature of Work l~ _'re -~ "' ,,' Valuation Issued By ~ Sanitary Sewer Size Storm Sewer Water Service Material Type # Conn. Type Parcelld # 1320511003 $450.00 Plan Approval $20.00 0 Permit Voided I $0.00 Permit Fees Date 09/08/2005 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Telephone Number 920-589-4014 Address 1865 JAMES RD AgenUOwner OSHKOSH WI 54904 - 0000 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. II