HomeMy WebLinkAbout2005-Building (driveway)
e
OSHKOSH
ON THE WATER
Job Address 2102PLYMOUTHST
CITY OF OSHKOSH
No
116187
BUILDING PERMIT - APPLICATION AND RECORD
Owner STEVEN J/AMANDA SEEGERS
Create Date
09/08/2005
Designer
Contractor
OWNER
Category
256 - Parking Lots, Driveways
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
~Sq.Ft.
~Sq.Ft.
Rooms
0
Height 0 Ft.
0 Projection I
Canopies 0
Finished/Living
Bedrooms
Stories
Garage
~Sq.Ft.
Baths
Signs
0
Foundation
0 Poured Concrete. Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units ---.l!
# Structures
---.l!
Use/Nature SFRI Pave gravel drive between garage and sidewaik. Driveway will be same width as attached garage.
ofWork
HVAC Contractor
Plumbing Contractor
Electric Contractor
Issued By:
$800.00 Plan Approval
$0.00 Permit Fee Paid
$20.00 Park Dedication
$0.00
Date 09/0812005
Final/O.P. 00/00/0000
0 Permit Voided I
Parcel Id # 1212620000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature /./ Á-4'A'? ~ ' ¿ ~A
Agent/Owner
Address 2102 PLYMOUTH ST OSHKOSH
Date
9-ti f-tJ 5
WI 54901 - 0000
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.