HomeMy WebLinkAbout0116196-Building (bathroom)
0 CITY OF OSHKOSH No 116196
OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 861 ECKARDT CT Owner WilLIAM R WilDE/BARBARA ROHLF Create Date 09/08/2005
Designer
Contractor
TOM WilLIAMS BUilDING CONTRACTOR
Category
140 -Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
J
Zoning
Class of Canst:
Size
Unfinished/Basement
-.JJ Sq. Ft.
-.JJ Sq. Ft.
Rooms
Height
OFt.
D Projection I
Finished/Living
Bedrooms 0
Stories
Canopies
Garage
-.JJ Sq. Ft.
Baths
0
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units ----.C!
# Structures
0
Use/Nature
ofWork
FRIREmodel upper & lower baths-no bearing walls are being moved. Installation of an exhaust fan is required.
HVAC Contractor
Plumbing Contractor
KURT ZENTNER & SONS INC
Electric Contractor
WITZKE ELECTRIC INC
Fees: Valuation
Issued By: U )v--
$8,000.00 Plan Approval
$0.00 Permit Fee Paid
$62.00 Park Dedication
$0.00
Date 09/08/2005
Final/O,P. 00/00/0000
D Permit Voided I
Parcelld # 1413000000
in the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which It is not a parfy, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
~~~d:~::do ecure any ne ss approv, before starting such activity. Date") q - 'i? . ÕC:::;
AgenVOwner (:T
OSHKOSH
~ 54902 - 0000 Telephone Number
233-7817
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.