Loading...
HomeMy WebLinkAbout0116192-Building (siding) ~ OSHKOSH ON THE WATER Job Address 680 BOYD ST CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD No 116192 Owner GLEN K/PATRICIA ARNOLDUSSEN Create Date 09/08/2005 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Canst: Size Unfinished/Basement ----2 Sq. Ft. Rooms Height 0 Ft. Finished/Living ----2 Sq. Ft. Bedrooms 0 Stories Garage ----2 Sq. Ft. Baths 0 0 Projection I Canopies ----2 Signs ----2 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR /INSTALL SIDING ON HOUSE, REPLACING WOOD WITH VINYL, NO STRUCTURAL CHANGES. ELECTRIC NOT of Work PPLICABLE BECAUSE J BLOCKS PREVIOUSLY INSTALLED. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $4.000.00 Plan Approval $0.00 Permit Fee Paid $38.00 Park Dedication $0.00 Issued By: ~Q Date 09/0812005 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 1101770000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which It is not a party. if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to c re any necessary a provals before starting such activity. Date CI-?-a¡; Agent/Owner OSHKOSH WI 54901 - 4635 Telephone Number Signature Address 680 BOYD ST To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.