HomeMy WebLinkAbout0116192-Building (siding)
~
OSHKOSH
ON THE WATER
Job Address 680 BOYD ST
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
No
116192
Owner GLEN K/PATRICIA ARNOLDUSSEN
Create Date
09/08/2005
Designer
Contractor
OWNER
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Canst:
Size
Unfinished/Basement ----2 Sq. Ft. Rooms Height 0 Ft.
Finished/Living ----2 Sq. Ft. Bedrooms 0 Stories
Garage ----2 Sq. Ft. Baths 0
0 Projection I
Canopies ----2
Signs
----2
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units 0
# Structures
0
Use/Nature SFR /INSTALL SIDING ON HOUSE, REPLACING WOOD WITH VINYL, NO STRUCTURAL CHANGES. ELECTRIC NOT
of Work PPLICABLE BECAUSE J BLOCKS PREVIOUSLY INSTALLED.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$4.000.00 Plan Approval
$0.00 Permit Fee Paid
$38.00 Park Dedication
$0.00
Issued By: ~Q
Date 09/0812005
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 1101770000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which It is not a party. if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to c re any necessary a provals before starting such activity.
Date CI-?-a¡;
Agent/Owner
OSHKOSH
WI 54901 - 4635
Telephone Number
Signature
Address 680 BOYD ST
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.