Loading...
HomeMy WebLinkAbout0116206-Plumbing (lavatory/water heater) e OSHKOSH ON THE WATER Job Address 310 W 7TH AVE CITY OF OSHKOSH No 116206 Contractor JIM'S PLUMBING & HEATING INC Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work PLUMBING PERMIT - APPLICATION AND RECORD 0 0 1 0 0 0 1 0 0 0 Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind 0 0 0 0 0 0 0 0 0 Water Softner Local Waste Clothes Wshr OWner MARIE E TOLLARD Category 410 - Residential-Interior 0 0 0 0 0 0 0 0 0 Wait.St. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink Create Date 09/0812005 Plan 0 0 0 0 0 0 0 0 0 Shamp Sink 0 FlrlWst Sink 0 Catch Basin 0 Wash Ftn 0 Urinal 0 Standp Rec 0 Ice Maker 0 Gar Drain 0 Soda Disp 0 Coffee Maker 0 Int Grease Trap 0 Ext Grease Trap 0 RPZValve 0 Eye Wash Statn 0 Wtr Sewer Mtrs 0 Deduct Meters 0 Wtr Usage Mtrs 0 Bidet Beer Tap Lab Sink Sterilizer Dip Well Drink Ftn FRllnstalilav, power vented water heater, repipe drain & water In basement. Size Material Type # Conn. Type Sanitary Sewer 0 0 0 0 0 Storm Sewer 0 0 0 0 0 Water Service 0 0 0 0 Parcelld # 0 0902710000 Valuation $3,000.00 Issued By ~ Plan Approval $0.00 Permit Fees Date 09/08/2005 $20.00 D Permit Voided I In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which It is not a party, if you perform the work described In this penmit application within an easement, tI1e City strongly urges the penmit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address W6166 GREENVILLE DR Agent/Owner GREENVILLE WI 54942 - 0000 Telephone Number 920-757-5258 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.