Loading...
HomeMy WebLinkAbout0116158-Building (siding) 0 OSHKOSH ON THE WATER Job Address 1112WBENTAVE CITY OF OSHKOSH No 116158 BUILDING PERMIT - APPLICATION AND RECORD Owner ELIZABETH J FINK Create Date 09/07/2005 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy Q Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~Sq.Ft. Bedrooms 0 Stories Garage ~Sq.Ft. Baths 0 D Projection I Canopies 0 Signs 0 Foundation . Poured Concrete 0 Floating Siab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units ------2 # Structures 0 Use/Nature SFRIReplace existing aluminum siding on house & garage with vinyl. Replace downspouts.' Electric not applicable-no outside lights. NO of Work STRUCTURAL WORK. issued to NEW owner. Mark Showers. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation Issued By: ~ $3.000.00 Plan Approval $0.00 Permit Fee Paid $32.00 Park Dedication $0.00 Date 09/07/2005 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1206900000 In the performance of this work I agree to perform ali work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secur fèØne sa. rD1!1provais before starting such activity. Signature ~/"., (#I ,,(_)/A:¡,,(.4~ Date 01/07Ä'~ AgenUOwner Oshkosh WI 54901 - 0000 Telephone Number 3:>;;>-- 07:3:) Address To schedule inspections please cali the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.