HomeMy WebLinkAbout0116158-Building (siding)
0
OSHKOSH
ON THE WATER
Job Address 1112WBENTAVE
CITY OF OSHKOSH
No
116158
BUILDING PERMIT - APPLICATION AND RECORD
Owner ELIZABETH J FINK
Create Date
09/07/2005
Designer
Contractor
OWNER
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
Q Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft.
Finished/Living ~Sq.Ft. Bedrooms 0 Stories
Garage ~Sq.Ft. Baths 0
D Projection I
Canopies 0
Signs
0
Foundation
. Poured Concrete 0 Floating Siab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units ------2
# Structures
0
Use/Nature SFRIReplace existing aluminum siding on house & garage with vinyl. Replace downspouts.' Electric not applicable-no outside lights. NO
of Work STRUCTURAL WORK. issued to NEW owner. Mark Showers.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
Issued By: ~
$3.000.00 Plan Approval
$0.00 Permit Fee Paid
$32.00 Park Dedication
$0.00
Date 09/07/2005
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 1206900000
In the performance of this work I agree to perform ali work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secur fèØne sa. rD1!1provais before starting such activity.
Signature ~/"., (#I ,,(_)/A:¡,,(.4~ Date 01/07Ä'~
AgenUOwner
Oshkosh
WI 54901 - 0000
Telephone Number
3:>;;>-- 07:3:)
Address
To schedule inspections please cali the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.