Loading...
HomeMy WebLinkAbout0116126 P e OSHKOSH ON THE WATER Job Address 1021 WISCONSIN ST CITY OF OSHKOSH No 116126 PLUMBING PERMIT - APPLICATION AND RECORD Owner VICTORIA M VANASTEN Create Date 09/06/2005 Plan Contractor SAMMONS PLUMBING Bathtub 0 Whirlpool ~ Lavatory ~ Toilet 0 Res. Sink 0 Bar Sink 0 Water Heater 1 Site Drain 0 Roof Drain 0 Misc. 0 Fixtures Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Braakrm Sink Ejector/Grind Category 411 - Residential-Water Heaters 0 0 0 0 0 0 0 0 0 Water Softner 0 Wail.SI. 0 Shamp Sink 0 Coffee Maker 0 Local Waste 0 Ice Chest 0 Flr/WstSink 0 Int Grease Trap 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 Bidet 0 Sculry Sink 0 Wash Ftn 0 RPZValve 0 Beer Tap 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Wtr Sewer Mtrs 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Deduct Meters 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 Wtr Usage Mtrs 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 Use/Nature ofWork I"""'~-"-' Size Type # 0 0 0 0 0 Conn. Type Material Sanitary Sewer Storm Sewer Water Service Parcelld # 0502160000 Valuation 700.00 Plan Approval Permit Fees Issued By $0.00 $20.00 0 Permit Voided i Date 09/06/2005 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date WI 54901 - 2298 Address 522 W. MURDOCK AVE AgenUOwner OSHKOSH Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.