Loading...
HomeMy WebLinkAbout0116121-Plumbing (water heater) e OSHKOSH ON THE WATER Job Address 1010 N WESTFIELO ST CITY OF OSHKOSH No 116121 PLUMBING PERMIT - APPLICATION AND RECORD Owner EVERGREEN RETIREMENT COMM INC Plan Create Date 09106/2005 Category 411 - Residential-Water Heaters Contractor MERTEN PLUMBING Bathtub 0 Shower 0 Water Softner 0 Wait. St. Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink Toilet 0 Disposal 0 Bidet 0 Sculry Sink Res. Sink 0 Dishwasher 0 BeerTap 0 Hand Sink Bar Sink 0 Sump Pump 0 Lab Sink 0 PlasterSink Water Heater 1 Classrm Sink 0 Sterilizer 0 Surgeons Sink Site Drain 0 Breakrm Sink 0 DipWell 0 F Prep Sink Roof Drain 0 EjectorlGrind 0 Drink Ftn 0 Serv Sink Misc. 0 Fixtures UselNature I "IT ~~~'OO'" of Work Size Material Sanitary Sewer 0 Shamp Sink 0 0 FlrlWst Sink 0 0 Catch Basin 0 0 Wash Ftn 0 0 Urinal 0 0 Standp Rec 0 0 Ice Maker 0 0 Gar Drain 0 0 Soda Disp 0 Coffee Maker ~ Int Grease Trap ~ Ext Grease Trap ~ RPZ Valve 0 Eye Wash Statn 0 Wtr Sewer Mtrs 0 Deduct Meters 0 Wtr Usage Mtrs 0 Storm Sewer Water Service Type # Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $20.00 0 PermitVoided Parcelld # Valuation $700.00 $0.00 Permit Fees Plan Approval Issued By Date 09/06/2005 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 1076 COZY LN Agent/Owner OSHKOSH Telephone Number 231-6795 WI 54901 - 0000 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.