HomeMy WebLinkAbout0116115-Building (siding)
e
OSHKOSH
ON THE WATER
Job Address 628 WAUGOO AVE
CITY OF OSHKOSH
No
116115
BUILDING PERMIT - APPLICATION AND RECORD
Owner NANCY L EIDEN
Create Date
09/06/2005
Desi9ner
Contractor
RB ROOFING & SIDING
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft.
Finished/Living ~Sq.Ft. Bedrooms 0 Stories
Garage ~Sq.Ft. Baths 0
0 Projection I
Canopies ~
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units ~
# Structures
0
Use/Nature RENTAU Installing vinyl siding on the house and re-roofing the house. No electrical work will be done In association with the installation
of Work fthesiding.
HVAC Contractor'
Plumbing Contractor
Electric Contractor
Fees: Valuation
Issued By: \~
$9.675.00 Plan Approval
$0.00 Permit Fee Paid
$74.00 Park Dedication
$0.00
Date 09/06/2005
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 0202450000
In the performance of this work I agree to perform all work pursuant to nules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a pariy. if you perform the work
described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement
:~:~~::::~ec r ny necessary approvals before starting such a 'vi~. Dat"P9-6-ð
Address 741 W 17TH AVE WI 64902 - 0000 Telephone Number 426-2073
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.