HomeMy WebLinkAbout0116156-Building (roof)
e
OSHKOSH
ON THE WATER
Job Address 31 MILL ST
CITY OF OSHKOSH
No
116156
BUILDING PERMIT - APPLICATION AND RECORD
Owner BARRY L GAUTHIER
Create Date
09/06/2005
Designer
Contractor
OWNER
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Finished/Living
~Sq.Ft.
~Sq.Ft.
Rooms
Height 0 Ft.
Dprojection I
Unfinished/Basement
Bedrooms 0
Stories
Canopies 0
Garage
~Sq.Ft.
Baths
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units 0
# Structures
0
Use/Nature SFRITear off wood siding on house and replace with vinyi siding. Tear off and replace existing roofing on house. Replacing gutters and
of Work ownspouts. Owner to remove and re-install electrical fixture(s). NO STRUCTURAL CHANGES.
HVAC Contractor
Plumbing Contractor
----~
Electric Contractor
Fees: Valuation
$5,300.00 Plan Approval
$0.00 Permit Fee Paid
$50.00 Park Dedicalion
$0.00
Issued By:
Date 09/06/2005
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 0800950000
In the performance of this work i agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary a provals be sta~g such activity.
Signature
Agent/Owner
OSHKOSH
Date "'J/,Ç/~S
/ '
Address 2240 CRANE ST
WI 54901 - 1765
Telephone Number il#.- :2-Y/-:J./)L¡1:
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (I.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.