Loading...
HomeMy WebLinkAbout0116116-Building (garage slab) e OSHKOSH ON THE WATER Job Address 332 DALE AVE CITY OF OSHKOSH No 116116 BUILDING PERMIT - APPLICATION AND RECORD Owner THOMAS G PUTZER Create Date 09/06/2005 Designer Contractor OWNER Category 153 - Foundation Permit Accessory Structures Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. Rooms Height 0 Ft. Finished/Living ~Sq.Ft. Bedrooms 0 Stories Garage ~Sq.Ft. Baths 0 0 Projection I Canopies 0 Signs 0 Foundation . Poured Concrete 0 Fioating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit # Dwelling Units ---2 # Structures 0 Park Dedication Use/Nature ~FRI RENEWAU Pouring a 12' x 24' concrete grade beam slab to construct a future garage. A seperate permit will be required for of Work þonstruction of the garage. HVAC Contractor Plumbing Contractor Electric Contractor $1,000,00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Fees: Valuation Issued By: 9) Date 09/06/2005 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 0403960000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit appiication within an easement, the City strongly urges the permit appiicant to contact the easement holder(s) and to secure any necess pprov fore starting such activity, Date I( rEf --r:P Agent/Owner OSHKOSH ~ 54901 - 5211 Telephone Number Signature Address 628 CEAPE AVE To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.