HomeMy WebLinkAbout0116151-Plumbing (sink)
e
OSHKOSH
ON THE WATER
Job Address 1415 COOLIDGE AVE
CITY OF OSHKOSH
No
116151
PLUMBING PERMIT - APPLICATION AND RECORD
Owner DONALD E SCHUELKE
Create Date 09/06/2005
Contractor SAMMONS PLUMBING
Category 410 - Residential-Interior
Bathtub 0 Shower 0 Water Softner 0 Wait. St. 0
Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0
Lavatory 1 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0
Toilet 0 Disposal 0 Bidet 0 Sculry Sink 0
Res. Sink 0 Dishwasher 0 BeerTap 0 Hand Sink 0
Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0
Water Heater 0 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0
Site Drain 0 Breakrm Sink 0 Dip Well 0 F Prep Sink 0
Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 0
Misc. 0
Fixtures
Plan
Shamp Sink ~
FlrlWstSink 0
Catch Basin 0
Wash Ftn 0
Urinal 0
Standp Rec ~
Ice Maker 0
Gar Drain 0
Soda Disp 0
Coffee Maker ~
Int Grease Trap ~
Ex! Grease Trap ~
RPZValve 0
Eye Wash Statn 0
Wtr Sewer Mtrs 0
Deduct Meters 0
Wtr Usage Mtrs 0
Use/Nature
ofWork
I-'~'""
Size
Material
Type
Sanitary Sewer
Storm Sewer
Water Service
Valuation
$300.00
Plan Approval
$0.00
Permit Fees
Issued By
#
0
0
0
0
0
Conn. Type
0
0
0
0
0
$20.00 D Permit Voided I
Parcelld #
0000000000
Date 09/06/2005
In the performance of this work. I agree to perform all work pursuant to ruies governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work
described in this permit application within an easement. the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 522W.MURDOCKAVE
AgenUOwner
OSHKOSH
WI 54901 - 2298
Telephone Number 231-9880
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.