HomeMy WebLinkAbout0116147-Plumbing (water heater)
0
OSHKOSH
ON THE WATER
Job Address 1411 CEDARST
CITY OF OSHKOSH
PLUMBING PERMIT. APPLICATION AND RECORD
No
116147
Owner MARY ANN DERESINSKI ETAL
Plan
Contractor SAMMONS PLUMBING
Create Date 09/06/2005
Category 411 - Residential-Water Heaters
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature
of Work
Valuation
Issued By
0
0
0
0
0
0
1
0
0
0
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
0
0
0
0
0
0
0
0
0
Water Sollner
Local Waste
Clothes Wshr
0 Wait.St.
0 Ice Chest
0 Exam Sink
0 Sculry Sink
0 Hand Sink
0 PlasterSink
0 Surgeons Sink
0 F Prep Sink
0 Serv Sink
Material
Permit Fees
Type
0
0
0
0
0
0
0
0
0
Coffee Maker ~
Int Grease Trap ~
Ext Grease Trap ~
RPZ Valve 0
Eye Wash Statn 0
Wtr Sewer Mtrs 0
Deduct Meters 0
Wtr Usage Mtrs 0
I-'~--"-'
Bidet
Beer Tap
Lab Sink
Sterilizer
Dip Well
Drink Ftn
Shamp Sink ~
FlrlWstSink 0
Catch Basin 0
Wash Ftn 0
Urinal 0
Standp Rec 0
Ice Maker 0
Gar Drain 0
Soda Disp 0
Sanitary Sewer
Size
Storm Sewer
Water Service
$600.00
Plan Approval
$0.00
#
0
0
0
0
0
Conn. Type
0
0
0
0
0
Parcelld #
0000000000
$20.00 0 Permit Voided I
Date 09/06/2005
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Telephone Number 231-9880
Address 522W. MURDOCK AVE
AgenVOwner
OSHKOSH
WI 54901 - 2298
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.