Loading...
HomeMy WebLinkAbout0116147-Plumbing (water heater) 0 OSHKOSH ON THE WATER Job Address 1411 CEDARST CITY OF OSHKOSH PLUMBING PERMIT. APPLICATION AND RECORD No 116147 Owner MARY ANN DERESINSKI ETAL Plan Contractor SAMMONS PLUMBING Create Date 09/06/2005 Category 411 - Residential-Water Heaters Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Valuation Issued By 0 0 0 0 0 0 1 0 0 0 Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind 0 0 0 0 0 0 0 0 0 Water Sollner Local Waste Clothes Wshr 0 Wait.St. 0 Ice Chest 0 Exam Sink 0 Sculry Sink 0 Hand Sink 0 PlasterSink 0 Surgeons Sink 0 F Prep Sink 0 Serv Sink Material Permit Fees Type 0 0 0 0 0 0 0 0 0 Coffee Maker ~ Int Grease Trap ~ Ext Grease Trap ~ RPZ Valve 0 Eye Wash Statn 0 Wtr Sewer Mtrs 0 Deduct Meters 0 Wtr Usage Mtrs 0 I-'~--"-' Bidet Beer Tap Lab Sink Sterilizer Dip Well Drink Ftn Shamp Sink ~ FlrlWstSink 0 Catch Basin 0 Wash Ftn 0 Urinal 0 Standp Rec 0 Ice Maker 0 Gar Drain 0 Soda Disp 0 Sanitary Sewer Size Storm Sewer Water Service $600.00 Plan Approval $0.00 # 0 0 0 0 0 Conn. Type 0 0 0 0 0 Parcelld # 0000000000 $20.00 0 Permit Voided I Date 09/06/2005 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Telephone Number 231-9880 Address 522W. MURDOCK AVE AgenVOwner OSHKOSH WI 54901 - 2298 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.