Loading...
HomeMy WebLinkAbout0116072-Plumbing (toilet) ~ OSHKOSH ON THE WATER Job Address 1703 SHERIDAN ST CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD No 116072 Owner MARY C HAYNES Contractor M P KELLY Category 410 - Residential-Interior Bathtub 0 Shower 0 Whirlpool 0 Floor Drain 0 Lavatory 0 Lndry Tray 0 Toilet 1 Disposal 0 Res. Sink 0 Dishwasher 0 Bar Sink 0 Sump Pump 0 Water Heater 0 Classrm Sink 0 Site Drain 0 Breakrm Sink 0 Roof Drain 0 Ejector/Grind 0 Misc. 0 Fixtures Water Softner 0 Wail.SI. 0 Local Waste 0 Ice Chest 0 Clothes Wshr 0 Exam Sink 0 Bidet 0 Sculry Sink 0 Beer Tap 0 Hand Sink 0 Lab Sink 0 Plaster Sink 0 Sterilizer 0 Surgeons Sink 0 Dip Well 0 F Prep Sink 0 Drink Ftn 0 Serv Sink 0 Create Date 09/01/2005 Plan Shamp Sink ~ FlrlWst Sink 0 Catch Basin 0 Wash Ftn 0 Urinal 0 Standp Rec 0 Ice Maker 0 Gar Drain ~ Soda Disp 0 Coffee Maker 0 Int Grease Trap 0 Ext Grease Trap 0 RPZValve 0 EyeWashStatn ~ Wtr Sewer Mtrs 0 Deduct Meters 0 Wtr Usage Mtrs 0 Use/Nature of Work r-- Size Type Conn. Type Material Sanitary Sewer Storm Sewer Water Service Valuation $383.00 $0.00 Permit Fees Plan Approval Date 09/01/2005 Issued By # 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $20.00 0 Permit Voided I Parcelld # 1201340000 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 665 N MAIN ST Agent/Owner OSHKOSH WI 54901 - 4431 Telephone Number 231-1750 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.