HomeMy WebLinkAbout0116072-Plumbing (toilet)
~
OSHKOSH
ON THE WATER
Job Address 1703 SHERIDAN ST
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
No
116072
Owner MARY C HAYNES
Contractor M P KELLY
Category 410 - Residential-Interior
Bathtub 0 Shower 0
Whirlpool 0 Floor Drain 0
Lavatory 0 Lndry Tray 0
Toilet 1 Disposal 0
Res. Sink 0 Dishwasher 0
Bar Sink 0 Sump Pump 0
Water Heater 0 Classrm Sink 0
Site Drain 0 Breakrm Sink 0
Roof Drain 0 Ejector/Grind 0
Misc. 0
Fixtures
Water Softner 0 Wail.SI. 0
Local Waste 0 Ice Chest 0
Clothes Wshr 0 Exam Sink 0
Bidet 0 Sculry Sink 0
Beer Tap 0 Hand Sink 0
Lab Sink 0 Plaster Sink 0
Sterilizer 0 Surgeons Sink 0
Dip Well 0 F Prep Sink 0
Drink Ftn 0 Serv Sink 0
Create Date 09/01/2005
Plan
Shamp Sink ~
FlrlWst Sink 0
Catch Basin 0
Wash Ftn 0
Urinal 0
Standp Rec 0
Ice Maker 0
Gar Drain ~
Soda Disp 0
Coffee Maker 0
Int Grease Trap 0
Ext Grease Trap 0
RPZValve 0
EyeWashStatn ~
Wtr Sewer Mtrs 0
Deduct Meters 0
Wtr Usage Mtrs 0
Use/Nature
of Work
r--
Size
Type
Conn. Type
Material
Sanitary Sewer
Storm Sewer
Water Service
Valuation
$383.00
$0.00
Permit Fees
Plan Approval
Date 09/01/2005
Issued By
#
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$20.00 0 Permit Voided I
Parcelld #
1201340000
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement. the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 665 N MAIN ST
Agent/Owner
OSHKOSH
WI 54901 - 4431
Telephone Number 231-1750
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.