Loading...
HomeMy WebLinkAbout0116074-Plumbing (toilet) G OSHKOSH ON THE WATER Job Address 1408 N MAIN ST CITY OF OSHKOSH No 116074 PLUMBING PERMIT - APPLICATION AND RECORD Create Date 09/01/2005 Plan Contractor M P KELLY OWner LESTER W PETERSON Category. 410 - Residential-Interior Bathtub 0 Whirlpool ~ Lavatory ~ Toilet 1 Res. Sink 0 Bar Sink 0 Water Heater 0 Site Drain 0 Roof Drain 0 Misc. 0 Fixtures Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind 0 0 0 0 0 0 0 0 0 WaterSoftner 0 Wait.St. 0 Shamp Sink 0 Coffee Maker 0 Local Waste 0 Ice Chest 0 FlrlWst Sink 0 Int Grease Trap 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 Bidet 0 SculrySink 0 Wash Ftn 0 RPZValve 0 Beer Tap 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Wtr Sewer Mtrs 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Deduct Meters 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 Wtr Usage Mtrs 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 Use/Nature ofWork rm_œ.. Sanitary Sewer Size Material Storm Sewer Water Service Type # Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $20.00 0 Permit Voided I Parcelld # 1505080000 Valuation $476.00 Plan Approval Issued By $0.00 Permit Fees Date 09/01/2005 in the performance of this work, I agree to perform all work pursuant to rules governing the described construction. Whiie the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 665 N MAIN ST Telephone Number 231-1750 Agent/Owner OSHKOSH WI 54901 - 4431 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.