HomeMy WebLinkAbout0116074-Plumbing (toilet)
G
OSHKOSH
ON THE WATER
Job Address 1408 N MAIN ST
CITY OF OSHKOSH
No
116074
PLUMBING PERMIT - APPLICATION AND RECORD
Create Date 09/01/2005
Plan
Contractor M P KELLY
OWner LESTER W PETERSON
Category. 410 - Residential-Interior
Bathtub 0
Whirlpool ~
Lavatory ~
Toilet 1
Res. Sink 0
Bar Sink 0
Water Heater 0
Site Drain 0
Roof Drain 0
Misc. 0
Fixtures
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
0
0
0
0
0
0
0
0
0
WaterSoftner 0 Wait.St. 0 Shamp Sink 0 Coffee Maker 0
Local Waste 0 Ice Chest 0 FlrlWst Sink 0 Int Grease Trap 0
Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0
Bidet 0 SculrySink 0 Wash Ftn 0 RPZValve 0
Beer Tap 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0
Lab Sink 0 Plaster Sink 0 Standp Rec 0 Wtr Sewer Mtrs 0
Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Deduct Meters 0
Dip Well 0 F Prep Sink 0 Gar Drain 0 Wtr Usage Mtrs 0
Drink Ftn 0 Serv Sink 0 Soda Disp 0
Use/Nature
ofWork
rm_œ..
Sanitary Sewer
Size
Material
Storm Sewer
Water Service
Type # Conn. Type
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$20.00 0 Permit Voided I
Parcelld #
1505080000
Valuation
$476.00
Plan Approval
Issued By
$0.00
Permit Fees
Date 09/01/2005
in the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
Whiie the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 665 N MAIN ST
Telephone Number 231-1750
Agent/Owner
OSHKOSH
WI 54901 - 4431
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.