HomeMy WebLinkAbout0116076-Plumbing (tub & toilet)
e
OSHKOSH
ON THE WATER
Job Address 1318 FAUST AVE
CITY OF OSHKOSH
PLUMBING PERMIT. APPLICATION AND RECORD
No
116076
Owner MARY JANE RYAN
Contractor M P KELLY
Category 410 - Residential-Interior
Create Date 09/01/2005
Plan
Bathtub 1 Shower 0 Water Softner 0 Wait. 51. 0 Shamp Sink 0 Coffee Maker 0
Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0 FlrlWst Sink 0 Int Grease Trap 0
Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0
Toilet 1 Disposal 0 Bidet 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0
Res. Sink 0 Dishwasher 0 BeerTap 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0
Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Wtr Sewer Mtrs ~
Water Heater 0 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Deduct Meters ~
Site Drain 0 Breakrm Sink 0 DipWell 0 F Prep Sink 0 Gar Drain 0 Wtr Usage Mtrs 0
Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0
Misc. 0
Fixtures
Use/Nature
of Work
l~W",W.
Size
Material
Type
#
0
0
0
0
0
0
0
0
0
0
Conn. Type
Sanitary Sewer
Stonn Sewer
Water Service
Valuation
$3.300.00
Plan Approval
$0.00
Permit Fees
0
0
0
0
0
$20.00 0 Pennit Voided I
Parcelld #
0608771100
Issued By
Date 09/01/2005
In the perfonnance of this work. I agree to perfonn all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perfonn the work
described in this pennit application within an easement. the City strongly urges the pennit appiicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 665 N MAIN ST
Agent/Owner
OSHKOSH
WI 54901 - 4431
Telephone Number 231-1750
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.