Loading...
HomeMy WebLinkAbout0116076-Plumbing (tub & toilet) e OSHKOSH ON THE WATER Job Address 1318 FAUST AVE CITY OF OSHKOSH PLUMBING PERMIT. APPLICATION AND RECORD No 116076 Owner MARY JANE RYAN Contractor M P KELLY Category 410 - Residential-Interior Create Date 09/01/2005 Plan Bathtub 1 Shower 0 Water Softner 0 Wait. 51. 0 Shamp Sink 0 Coffee Maker 0 Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0 FlrlWst Sink 0 Int Grease Trap 0 Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 Toilet 1 Disposal 0 Bidet 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0 Res. Sink 0 Dishwasher 0 BeerTap 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0 Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Wtr Sewer Mtrs ~ Water Heater 0 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Deduct Meters ~ Site Drain 0 Breakrm Sink 0 DipWell 0 F Prep Sink 0 Gar Drain 0 Wtr Usage Mtrs 0 Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 Misc. 0 Fixtures Use/Nature of Work l~W",W. Size Material Type # 0 0 0 0 0 0 0 0 0 0 Conn. Type Sanitary Sewer Stonn Sewer Water Service Valuation $3.300.00 Plan Approval $0.00 Permit Fees 0 0 0 0 0 $20.00 0 Pennit Voided I Parcelld # 0608771100 Issued By Date 09/01/2005 In the perfonnance of this work. I agree to perfonn all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perfonn the work described in this pennit application within an easement. the City strongly urges the pennit appiicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 665 N MAIN ST Agent/Owner OSHKOSH WI 54901 - 4431 Telephone Number 231-1750 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.