HomeMy WebLinkAbout0116084-Plumbing (disposal)
e CITY OF OSHKOSH No 116084
OSHKOSH PLUMBING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 1521 CLlFFVIEW DR Owner GERTRUDE M SNELLING Create Date 09/01/2005
Contractor M P KELLY Category 410 - Residential-Interior Plan
Water Softner ~ Wail.SI. 0 Shamp Sink ~ Coffee Maker 0
Local Waste 0 Ice Chest 0 FlrlWst Sink ~ Int Grease Trap 0
Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0
Bidet ~ SeulrySink 0 Wash Ftn ~ RPZ Valve 0
Beer Tap ~ Hand Sink 0 Urinal ~ Eye Wash Statn 0
Lab Sink ~ PlasterSink 0 Standp Rec ~ Wtr Sewer Mtrs 0
Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Deduct Meters 0
Dip Well ~ F Prep Sink 0 Gar Drain ~ Wtr Usage Mtrs 0
Drink Ftn ~ Serv Sink 0 Soda Disp ~
Bathtub ~ Shower ~
Whirlpool ~ Floor Drain 0
Lavatory ~ Lndry Tray ~
Toilet 0 Disposal 1
Res. Sink ~ Dishwasher ~
Bar Sink 0 Sump Pump 0
Water Heater 0 Classrm Sink 0
Site Drain 0 Breakrm Sink 0
Roof Drain ~ Ejector/Grind ~
Misc. 0
Fixtures
Use/Nature
of Work
r'-.'-
Type
#
0
0
0
0
0
0
0
0
0
0
.
Size
Material
Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Pareelld #
1522350000
Valuation
$358.00
Plan Approval
$0.00
Permit Fees
$20.00 0 Permit Voided I
Issued By
Date 09/0112005
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 665 N MAIN ST
AgenUOwner
OSHKOSH
WI 54901 - 4431
Telephone Number 231-1750
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready,