Loading...
HomeMy WebLinkAbout0116081-Plumbing (toilet) e OSHKOSH ON THE WATER Job Address 1619 ARIZONA ST CITY OF OSHKOSH No 116081 Create Date 09/01/2005 Plan 0 Shamp Sink 0 Coffee Maker 0 0 FlrlWst Sink 0 Int Grease Trap 0 0 Catch Basin 0 Ext Grease Trap 0 0 Wash Ftn 0 RPZ Valve ~ 0 Urinal 0 Eye Wash Statn 0 0 Standp Rec 0 Wtr Sewer Mtrs 0 0 Ice Maker 0 Deduct Meters 0 0 Gar Drain 0 Wtr Usage Mtrs 0 0 Soda Disp 0 PLUMBING PERMIT - APPLICATION AND RECORD Owner DONALD/JUDITH JUNGWIRTH Category 410 - Residential-Interior Contractor M P KELLY Bathtub 0 Shower 0 Water Softner 0 Wait St. Whirlpool 0 Floor Drain ~ Local Waste 0 Ice Chest Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink Toilet 1 Disposal ~ Bidet 0 Sculry Sink Res. Sink 0 Dishwasher 0 BeerTap 0 Hand Sink Bar Sink 0 Sump Pump ~ Lab Sink 0 Plaster Sink Water Heater 0 Classrm Sink 0 Sterilizer 0 Surgeons Sink Site Drain 0 Breakrm Sink 0 DipWell 0 F Prep Sink Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink Misc. 0 Fixtures Use/Nature r~=.. of Work Size Material Sanitary Sewer Storm Sewer Water Service Type # Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $20.00 D Permit Voided I Parcelld # 0908000000 Valuation $287.00 $0.00 Permit Fees Plan Approval Date 09/01/2005 Issued By In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a pariy, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 665 N MAIN ST Agent/Owner OSHKOSH Telephone Number 231-1750 WI 54901 - 4431 To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Penmit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.