HomeMy WebLinkAbout0116045-Building (roof)
e
OSHKOSH
ON THE WATER
Job Address 1332 CONGRESS AVE
CITY OF OSHKOSH
No
116045
BUILDING PERMIT - APPLICATION AND RECORD
OWner E MICHAEL ROBINSON
Create Date
08131/2005
Designer
Contractor
HICKEY ROOFING
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy 0 Fence 0 Raze
Class of Const:
Rooms 0 Height 0 Ft.
Bedrooms Stories
Baths 0
0 Pier 0 Other
0 Treated Wood
Size
Zoning
Unfinished/Basement
~Sq.Ft.
~Sq.Ft.
D Projection I
Finished/Living
Canopies 0
Garage
~Sq.Ft.
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
Occupancy Permit Not Required
Flood Plain No
Height Permit Not Required
Not Required
# Dwelling Units ~
# Structures
~
Park Dedication
Use/Nature
ofWork
FRI Tear-off roofing. install rubber roofing flat area. and reshingle front porch.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$3,624.00 Plan Approval
$0.00 Permit Fee Paid
$38.00 Park Dedication
$0.00
Issued By:
Date 08131/2005
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 1204940000
In the performance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
hoider(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 1427 BROAD ST
Agent/Owner
OSHKOSH
WI 54901 - 0000
Telephone Number
426-4008
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.