Loading...
HomeMy WebLinkAbout0116045-Building (roof) e OSHKOSH ON THE WATER Job Address 1332 CONGRESS AVE CITY OF OSHKOSH No 116045 BUILDING PERMIT - APPLICATION AND RECORD OWner E MICHAEL ROBINSON Create Date 08131/2005 Designer Contractor HICKEY ROOFING Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Class of Const: Rooms 0 Height 0 Ft. Bedrooms Stories Baths 0 0 Pier 0 Other 0 Treated Wood Size Zoning Unfinished/Basement ~Sq.Ft. ~Sq.Ft. D Projection I Finished/Living Canopies 0 Garage ~Sq.Ft. Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post Occupancy Permit Not Required Flood Plain No Height Permit Not Required Not Required # Dwelling Units ~ # Structures ~ Park Dedication Use/Nature ofWork FRI Tear-off roofing. install rubber roofing flat area. and reshingle front porch. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $3,624.00 Plan Approval $0.00 Permit Fee Paid $38.00 Park Dedication $0.00 Issued By: Date 08131/2005 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1204940000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement hoider(s) and to secure any necessary approvals before starting such activity. Signature Date Address 1427 BROAD ST Agent/Owner OSHKOSH WI 54901 - 0000 Telephone Number 426-4008 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.