HomeMy WebLinkAbout0115948-Building (windows)
e
OSHKOSH
ON THE WATER
Job Address 1839 OREGON ST
CITY OF OSHKOSH
BUILDING PERMIT. APPLICATION AND RECORD
No
115948
OWner RUTH M SMITH
Create Date
08119/2005
Designer
Contractor
VEARD HOME IMPROVEMENTS
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft.
Finished/Living ~Sq.Ft. Bedrooms 0 Stories
Garage ~Sq.Ft. Baths 0
D Projection I
Canopies ~
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
# Dwelling Units ------2
# Structures
------2
Park Dedication
Use/Nature SFRIlnstall 8 vinyl replacement (same size & location) windows. . NO STRUCTURAL WORK.
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
$4,000.00 Plan Approval
$0.00 Permit Fee Paid
$38.00 Park Dedication
$0.00
Fees: Valuation
Issued By:
Date 08/25/2005
Final/O.P. 00/00/0000
D PenmitVoided I
Parcelld # 1404830000
In the performance of this work I agree to perfonm all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonm the work
described in this permit application within an easement, the City strongly urges the penmit applicant to contact the easement
holder(s) and to secur ny necessary approvals before starting such activity.
Signature
Date ()8-ZS'- OS'
Address 1828 OREGON ST
OSHKOSH
Wi 54902 - 0000
Telephone Number
920-410-4853
To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.