Loading...
HomeMy WebLinkAbout0116026-HVAC (furnace) ~ OSHKOSH ON THE WATER Job Address 831 MILLER LN CITY OF OSHKOSH HVAC PERMIT -APPLICATION AND RECORD No 116026 OWner MICHAEL P BURNS Create Date 08130/2005 Plan Contractor PREMIUM AIR INC Fuel 1"1 Gas System n New l"'I Forced Air 1 1 Electric Chimney Type K) Chimney A Heat Loss . As Approved BTU Rate . As Per Plan Category 500 - Residential-Heating & Ventilating I I Oil 1 I Solar 1 I Solid 1 1 Electric [7] Replace n Other U Steam 1 1 Suppl. . DirectVent U AlC I 1 I Con. Burner 1 e ) Not Applicable U Vent U Radiant I I HotWater e ) Chimney B e ) Existing e ) Variable e ) Not Applicable e) Other Value Value Use/Nature SFRI Replace furnace - EIV provided by Premium Air - No Chimney Liner being installed Where an appliance is permanently disconnected of Work rom an existing chimney or vent (CN). the CN shall be resized as necessary to control flue gas condensation in the interior of the CN and 0 provide the appliance or appliances served with the req. draft. Fees: Valuation $2,378.00 Plan Approval $0.00 Permit Fee Paid $41.00 Issued By: Date 08/30/2005 D Permit Voided I Parcelld # 1519623700 In the perfonnance of this work, I agree to perfonn all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonn the work described in this pennit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/OWner Address N3225 HWY 15 HORTONVILLE WI 54944-0 Telephone Number 920-982-3323 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.