HomeMy WebLinkAbout0116036-Building (siding)
0
OSHKOSH
ON THE WATER
Job Address 1928 FABRY ST
CITY OF OSHKOSH
No
116036
BUILDING PERMIT - APPLICATION AND RECORD
Owner ROBERT H MERONK
Create Date
08/30/2005
Contractor
BRIAN BERNIER CONSTRUCTION
Designer
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft.
Finished/Living ~Sq.Ft. Bedrooms 0 Stories
Garage ~Sq.Ft. Baths
0 Proje~
Canopies 0
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Penmit Not Required
Park Dedication
Flood Plain
Height Permit
# Dwelling Units ~
# Structures
0
Use/Nature
ofWork
FRlTear off old siding and replace with vinyl siding on house and garage. Installing new gutters and downspouts. Electrical work by
eckar Electric. NO STRUCTURAL CHANGES.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$7,000.00 Plan Approval
$0.00 Permit Fee Paid
$56.00 Park Dedication
$0.00
Issued By:
Date 08/30/2005
Final/O.P. 00/00/0000
0 Permit Voided I
Parcel Id # 1412470000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature ¡J~ tf.e4/M'a--
/
Date
!?h./os
/ !
920-420-7647
AgenUOwner
Address 436 W 19TH AVE
Oshkosh
WI 54902 - 0000
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.