Loading...
HomeMy WebLinkAbout0116036-Building (siding) 0 OSHKOSH ON THE WATER Job Address 1928 FABRY ST CITY OF OSHKOSH No 116036 BUILDING PERMIT - APPLICATION AND RECORD Owner ROBERT H MERONK Create Date 08/30/2005 Contractor BRIAN BERNIER CONSTRUCTION Designer Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~Sq.Ft. Bedrooms 0 Stories Garage ~Sq.Ft. Baths 0 Proje~ Canopies 0 Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Penmit Not Required Park Dedication Flood Plain Height Permit # Dwelling Units ~ # Structures 0 Use/Nature ofWork FRlTear off old siding and replace with vinyl siding on house and garage. Installing new gutters and downspouts. Electrical work by eckar Electric. NO STRUCTURAL CHANGES. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $7,000.00 Plan Approval $0.00 Permit Fee Paid $56.00 Park Dedication $0.00 Issued By: Date 08/30/2005 Final/O.P. 00/00/0000 0 Permit Voided I Parcel Id # 1412470000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature ¡J~ tf.e4/M'a-- / Date !?h./os / ! 920-420-7647 AgenUOwner Address 436 W 19TH AVE Oshkosh WI 54902 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.