HomeMy WebLinkAbout0116002 B
e
OSHKOSH
ON THE WATER
Job Address 502 E PAR~AY AVE
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
No
116002
Owner STEPHANIE S TOMKO
Create Date
08/29/2005
Designer
Contractor
WINDOW WORLD OF MILWAUKEE
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy 0 Fence 0 Raze
Class of Const:
Rooms 0 Height 0 Ft.
Bedrooms 0 Stories
Baths 0
0 Pier 0 Other
0 Treated Wood
Zoning
Size
Unfinished/Basement
--.!! Sq. Ft.
--.!! Sq. Ft.
D Projection I
Finished/Living
Canopies 0
Garage
--.!! Sq. Ft.
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
Occupancy Permit Not Required
Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# Dwelling Units 0
# Structures
~
Use/Nature SFRIlnstaliation of 9 vinyl replacement windows in existing openings - NO STRUCTURAL WORK!
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$2.395.00 Plan Approval
$0.00 Permit Fee Paid
$32.00 Park Dedication
$0.00
Issued By:
Date 08129/2005
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 0406150000
in the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work
described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 625 FOND DU LAC AVE
AgenUOwner
FOND DU LAC
WI 54935 - 0000
Telephone Number
920-923-4189
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will as~ume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.