Loading...
HomeMy WebLinkAbout0115982-Building (siding) G OSHKOSH ON THE WATER Job Address 924ENEWYORKAVE CITY OF OSHKOSH No 115982 BUILDING PERMIT. APPLICATION AND RECORD Owner ROBERT H/LOIS K DUMDIE Create Date 08/29/2005 Designer Contractor OUTSIDER SIDING Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement -----.2 Sq. Ft. -----.2 Sq. Ft. Rooms Height 0 Ft. D Projection I Finished/Living Bedrooms 0 Stories Canopies Garage -----.2 Sq. Ft. Baths Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures ~ Use/Nature of Work FRI Replacing wood siding with vinyl siding on the house and garage. J Biocks previously installed for the iights. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $600000 Plan Approval CVf' $0.00 Permit Fee Paid $50.00 Park Dedication $0.00 Issued By: Date 08/29/2005 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1509980000 In the performance of this work I agree to perfonm all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonm the work described in this penmit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necess approvais before starting such activity. >---\ AgenUOwner OSHKOSH Date .J.::::" :>(-2'1-<>3- Signature Address 426 BOYD ST WI 54902 - 0000 Telephone Number 426-0120 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.