Loading...
HomeMy WebLinkAbout0115998-Building (siding) 0 OSHKOSH ON THE WATER Job Address 1213 GRAND ST CITY OF OSHKOSH No 115998 BUILDING PERMIT -APPLICATION AND RECORD Owner GERALD F/JUDY M HENDRICKSON Create Date 08/29/2005 Designer Contractor LETT SIDING & TRIM Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Class of Const: Rooms 0 Height 0 Ft. Bedrooms Stories Baths 0 0 Pier 0 Other 0 Treated Wood Size Zoning Unfinished/Basement ~Sq.Ft. ~Sq.Ft. 0 Projection I Finished/Living Canopies 0 Garage ~ Sq. Ft. Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Owelling Units ~ # Structures ~ Use/Nature ofWork FRilnstall vinyl siding on house and garage. and install soffit and fascia on garage only. HVAC Contractor Plumbing Contractor Electric Contractor $5,800.00 Plan Approval $0.00 Permit Fee Paid $50.00 Park Dedication $0.00 Fees: Valuation Issued By: Date 08/29/2005 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 1506970000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 5737 CLEVEDON LN AgenUOWner OSHKOSH WI 54904 - 0000 Telephone Number 920-233-4144 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (I.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.