HomeMy WebLinkAbout0116014-Building (siding)
e
OSHKOSH
ON THE WATER
Job Address 1303BISMARCKAVE
CITY OF OSHKOSH
No
116014
BUILDING PERMIT -APPLICATION AND RECORD
Owner
DEAN ElK LYNNE SCHULZ REV TRUST
Create Date
08/29/2005
Designer
Contractor
OWNER
Category
141 - Exterior Remodeling
Plan
Type
. Buiiding
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
---.-2 Sq. Ft.
---.-2 Sq. Ft.
Rooms 0 Height
Bedrooms 0 Stories
Baths 0
0 Pier 0 Other
0 Treated Wood
0 Ft.
0 Projection I
Finished/Living
Canopies 0
Garage
---.-2 Sq. Ft.
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Biock 0 Post
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units ---------2
# Structures
0
Use/Nature SFR/instaii siding on lower half of front and sides of house. NO STRUCTURAL CHANGES.
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
'Fees: Valuation
$1.100.00 Plan Approval
$0.00 Permit Fee Paid
$26.00 Park Dedication
$0.00
Issued By:
Date 08/29/2005
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 0610350000
in the performance of this work I agree to perform ali work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work
described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement
hoider(s) and to secure any necessary approvals before starting such activity.
Signature Kax--:-1u /r~ / d J~
ent/Owner
Date ,ý -':?9-¿¡Š
Address 1303 BISMARCK AVE
OSHKOSH
WI 54902 - 5618
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.