Loading...
HomeMy WebLinkAbout0116014-Building (siding) e OSHKOSH ON THE WATER Job Address 1303BISMARCKAVE CITY OF OSHKOSH No 116014 BUILDING PERMIT -APPLICATION AND RECORD Owner DEAN ElK LYNNE SCHULZ REV TRUST Create Date 08/29/2005 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Buiiding 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ---.-2 Sq. Ft. ---.-2 Sq. Ft. Rooms 0 Height Bedrooms 0 Stories Baths 0 0 Pier 0 Other 0 Treated Wood 0 Ft. 0 Projection I Finished/Living Canopies 0 Garage ---.-2 Sq. Ft. Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Biock 0 Post Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units ---------2 # Structures 0 Use/Nature SFR/instaii siding on lower half of front and sides of house. NO STRUCTURAL CHANGES. of Work HVAC Contractor Plumbing Contractor Electric Contractor 'Fees: Valuation $1.100.00 Plan Approval $0.00 Permit Fee Paid $26.00 Park Dedication $0.00 Issued By: Date 08/29/2005 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 0610350000 in the performance of this work I agree to perform ali work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement hoider(s) and to secure any necessary approvals before starting such activity. Signature Kax--:-1u /r~ / d J~ ent/Owner Date ,ý -':?9-¿¡Š Address 1303 BISMARCK AVE OSHKOSH WI 54902 - 5618 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.