HomeMy WebLinkAbout2005-Building (fire damage)
e
OSHKOSH
ON THE WATER
Job Address 1782 ROBIN AVE
CITY OF OSHKOSH
No
115978
BUILDING PERMIT -APPLICATION AND RECORD
Owner
Create Date
08/24/2005
Desi9ner
Contractor
PAUL DAVIS RESTORATION OF FOX VALLE
Category
214 - Alteration Parking Garages (building & open decked)
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class 01 Const:
Size
Unfinished/Basement ---.2 Sq. Ft. Rooms 0 Height 0 Ft.
Finished/Living ---.2 Sq. Ft. Bedrooms 0 Stories
Garage ---.2 Sq. Ft. Baths 0
0 Projection I
Canopies
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units ~
# Structures
~
Use/Nature LATE PERMIT - Reconstruct garage damaged by fire - To be reconstructed per original plan approval.
01 Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$30,000.00 Plan Approval
$0.00 Permit Fee Paid
$308.00 Park Dedication
$0.00
Issued By:
~
Date 08126/2005
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 1611790000
In the performance 01 this work I agree to perform all work pursuant to rules governing the described construction.
While the City 01 Oshkosh has no authority to enlorce easement restriellons 01 which it is not a party, ilyou perform the work
described in this permit application within an easemen~ the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals belore starting such activity.
Signature ~ ~Owner
Date
~
X g-;)Ç. ," (
Address 1555 S COMMERCIAL ST
NEENAH
WI 54956 - 4865
Telephone Number
920-729-1551
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.