Loading...
HomeMy WebLinkAbout2005-Building (fire damage) e OSHKOSH ON THE WATER Job Address 1782 ROBIN AVE CITY OF OSHKOSH No 115978 BUILDING PERMIT -APPLICATION AND RECORD Owner Create Date 08/24/2005 Desi9ner Contractor PAUL DAVIS RESTORATION OF FOX VALLE Category 214 - Alteration Parking Garages (building & open decked) Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class 01 Const: Size Unfinished/Basement ---.2 Sq. Ft. Rooms 0 Height 0 Ft. Finished/Living ---.2 Sq. Ft. Bedrooms 0 Stories Garage ---.2 Sq. Ft. Baths 0 0 Projection I Canopies Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures ~ Use/Nature LATE PERMIT - Reconstruct garage damaged by fire - To be reconstructed per original plan approval. 01 Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $30,000.00 Plan Approval $0.00 Permit Fee Paid $308.00 Park Dedication $0.00 Issued By: ~ Date 08126/2005 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 1611790000 In the performance 01 this work I agree to perform all work pursuant to rules governing the described construction. While the City 01 Oshkosh has no authority to enlorce easement restriellons 01 which it is not a party, ilyou perform the work described in this permit application within an easemen~ the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals belore starting such activity. Signature ~ ~Owner Date ~ X g-;)Ç. ," ( Address 1555 S COMMERCIAL ST NEENAH WI 54956 - 4865 Telephone Number 920-729-1551 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.