Loading...
HomeMy WebLinkAbout0115974-Building (front stairs) e OSHKOSH ON THE WATER Job Address 453 MOUNT VERNON ST CITY OF OSHKOSH BUILDING PERMIT. APPLICATION AND RECORD No 115974 Owner DENNIS P/DAWN M ARNOLD Create Date 08126/2005 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ---.2 Sq. Ft. Rooms 0 Height 0 Ft. Finished/Living ---.2 Sq. Ft. Bedrooms 0 Stories Garage ---.2 Sq. Ft. Baths 0 D Projection I Canopies 0 0 Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures ~ Use/Nature r>FRI Replacing the front stairs. All new installation shall meet current code requirements. of Work Plumbing Contractor HVAC Contractor Electric Contractor $1,000.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Fees: Valuation Issued By: , Date 08126/2005 Final/O.P. 00/00/0000 D Permit Voided I Parcel Id # 0400590000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure ny necessary a ,rova~efore sta'Ÿ"g su h activity. Signature ~, Date AgenUOWner x fj/Zk,Ä S- Address 453 MOUNT VERNON ST OSHKOSH WI 54901 - 4915 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.