Loading...
HomeMy WebLinkAbout0115931-Building (windows) ~ OSHKOSH ÒN THE WATER Job Address 216ALLENAVE CITY OF OSHKOSH No 115931 BUILDING PERMIT. APPLICATION AND RECORD Owner JOSEPH J/KATHY SALM Create Date 08/24/2005 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. ~Sq.Ft. Rooms Height 0 Ft. D Projection I Canopies ~ Finished/Living Bedrooms 0 Stories Garage ~ Sq. Ft. Baths Signs ~ Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit ~- Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature of Work :SFRIReplaCe existing windows and doors in house. NO STRUCTURAL CHANGES. r'mw_._' Received letter from homeowner authorizing Sue HVAC Contractor Plumbing Contractor Electric Contráctor Fees: Valuation $9,644.06 Plan Approval $0.00 Permit Fee Paid $74.00 Park Dedication $0.00 Issued By: Date 08124/2005 FinaI/O.P. 00/00/0000 D Permit Voided: Parcelld # 1518580000 In the performance of this work I agree to perfonm all work pursuant to rules 90vernlng the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which It is not a party, If you perform the work described In this penmlt application within an easement, the City strongiy urges the permit applicant to contact the easement h~lder(S) and to se'fre any neces'jary ;Jf'provals before starting such activity. , I SIgnature ~J.u ~~ Date X-;;? .... - os- AgenUOwner Address 216 ALLEN AVE OSHKOSH WI 54901 - 1954 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. /- /- c/ 1;iJ-. /'0 6 () Î-"'- j / ~~ £Þ:A/ J/~VD /Jrv1 rvu. / J r- - ¡ .{/7J '/vI)4< (J~ ~ . ~. é) /' / /' ..' / {ß'7 ./ ./ ~--?/~Þ-- ex' () a¿/La"/c t/> ~( J :J ~ cZÛv~ ~/ ¿;h7 t<- 7J:-I ~ r- ~ -- J..?-"J.. // ~ . þ .'~ :::.;r I ~~..¡;.. {f/- ~ (/ ~ f~ ,r¿Þ