HomeMy WebLinkAbout0115914-Building (driveway)
~'o
OSHKOSH
ON THE WATER
Job Address 2860 W 9TH AVE
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
No
115914
OWner RAYMOND L YEARWOOD
Create Date
08/24/2005
Designer
Contractor
FOX VALLEY ASPHALT
Category
256 ~ Parking Lots, Driveways
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft.
Finished/Living ~Sq.Ft. Bedrooms 0 Stories
Garage ~ Sq. Ft. Baths
0 Projection I
Canopies
Signs
Foundation
0 Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
. Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
II Dwelling Units ---'!
II Structures
---'!
Use/Nature RES/ Pave end of driveway and existing front yard tum around" Note: This permit does not cover work within the street right of way. A
of Work ermit must be secured from Public Works prior to paving in the Right of Way.
HVAC Contractor
Plumbing Contractor
Fees: Valuatio
$1,300.00 Plan Approval
$0.00 Permit Fee Paid
$26.00 Park Dedication
$0.00
Issued By:
Date 08/24/2005
Final/O.P, 00/00/0000
0 Permit Voided I
Parcelld II 0654150000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
hoider(s) and to re any necessa approvals before starting such activity.
Date!fJ-VOr
Agent/Owner
OSHKOSH
WI 54904 - 6500
Telephone Number
Signature
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc,), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
~ ì v--;,.
,£,.. '?-.
'¡ý tl
\~+ro:o
~v
C~~{J
~r~~
[
"Ct.ec t wi
ߣt'c- tû,,"'¡~ op...
~C<./< ,'h-<VetA.. 'Fkr'",