HomeMy WebLinkAbout0115906-Building (roof)
0
OSHKOSH
ON THE WATER
Job Address 1289 WHEATFIELD WAY
CITY OF OSHKOSH
No
115906
BUILDING PERMIT. APPLICATION AND RECORD
Owner TIMOTHY J LANDOLT
Create Date
08/23/2005
Designer
Contractor
WERNER HOME IMPROVEMENTS LLC
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
-~
Class of Const:
Size
Zoning
-..-
Unfinished/Basement
~Sq.Ft.
~Sq.Ft.
Rooms
Height
OFt.
D Projection I
Finished/Living
Bedrooms
Stories
Canopies 0
Garage
~Sq.Ft.
Baths
0
Signs
---~
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units 0
# Structures
0
Use/Nature SFRfTear off and replace roofing on house and garage. NO STRUCTURAL CHANGES.
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$4,100.00 Plan Approval _.~ Permit Fee Paid
$44.00 Park Dedication
$0.00
Issued By:
Date 08/23/2005
Final/O.P. 00/00/0000
D Permit Voided i
Parcelld#1341140000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonn the work
described in this per' applicatio within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and t secure a y neces ary approvals before starting such activity.
Signature
Date t\?3~
Address 2147 POINT COMFORT RD
AgenUOwner
OSHKOSH
~ 54902 - 7513 Telephone Number
236-9109
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.