Loading...
HomeMy WebLinkAbout0115901-Building (siding) ~ OSHKOSH ON THE WATER Job Address 217 W SOUTH PARK AVE CITY OF OSHKOSH No 115901 BUILDING PERMIT - APPLICATION AND RECORD Owner JASON GEFFERS Create Date 08/23/2005 Designer Contractor JJ GEFFERS INC Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. ~Sq.Ft. Rooms 0 Height 0 Ft. D Projection I Finished/Living Bedrooms Stories Canopies 0 Garage ~Sq.Ft. Baths Signs ~ Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures ~ Use/Nature ~FR/ Installing vinyl siding on the house (no electrical work in association with the siding), and razing the existing front porch. A 3'x3' of Work ~anding with frost protection will be installed. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation Issued By: ~ $5.000.00 Plan Approval $0.00 Permit Fee Paid $44.00 Park Dedication $0.00 Date 08/23/2005 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 0901540000 In the perfonmance of this work I agree to perfonm all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce eas~ment restrictions of which it is not a party, if you perform the work described in this penmit application within an easement,.ttie City strongly urges the penmit applicant to contact the easement holder(s) and to . c~¡é',ny necessary apPruva~lbre starting such activity. F- . Signature >-;-1:' V Dat CJ/:;'...;ll ¿/ . Agent/Owner Address 217 W SOUTH PAR AVE OSHKOSH WI 54902 - 6537 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.