HomeMy WebLinkAbout0115907-Building (siding)
0
OSHKOSH
ON THE WATER
Job Address 111WBENTAVE
CITY OF OSHKOSH
No
115907
BUILDING PERMIT. APPLICATION AND RECORD
Owner SHIRLEY M HENNING
Create Date
08123/2005
Designer
Contractor
OWNER
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
-~----~
Zoning
Class of Canst:
Size
Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft.
Finished/Living ~Sq.Ft. Bedrooms Stories
Garage ~Sq.Ft. Baths 0
D Projection I
Canopies 0
Signs
~
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units ------.J!
# Structures
0
Use/Nature ISFRIlnstall aluminum siding over existing wood siding on garage only. NO STRUCTURAL CHANGES. NO ELECTRICAL FIXTURES
of Work ! RE BEING REMOVED.
HVAC Contractor
Plumbing Contractor
Electric Contractor
$2,545.77 Plan Approval
$0.00 Permit Fee Paid
$32.00 Park Dedication
$0.00
Fees: Valuation
Issued By:
Date 08123/2005
Final/O.P. 00/00/0000
D Permit Voided!
Parcelld # 1502900000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to s cu e,any necessary appro before sta;ting such activity.
Signature
Date f' - ).3 - {J ç
WI 54901 - 2925 Telephone Number
To schedule inspections please cali the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.