HomeMy WebLinkAbout0115870-Building (roof)
e
OSHKOSH
ON THE WATER
Job Address 609 GROVE ST
CITY OF OSHKOSH
BUILDING PERMIT. APPLICATION AND RECORD
No
115870
Owner DONALD D/BRENDA WILSON
Create Date
08/19/2005
Designer
Contractor
OWNER
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy 0 Fence 0 Raze
Class of Const:
Rooms 0 Height 0 Ft.
Bedrooms 0 Stories
Baths
Zoning
Size
Unfinished/Basement
-----.2. Sq. Ft.
-----.2. Sq. Ft.
0 projectic>l1J
Finished/Living
Canopies
Garage
-----.2. Sq. Ft.
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units 0
# Structures
0
Use/Nature SFRI Tear off and replace roofing and decking on house. 'NO STRUCTURAL WORK.
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
Issued By: ~/
$4,995.00 Plan Approval
$0.00 Permit Fee Paid
$44.00 Park Dedication
$0.00
Date 08/19/2005
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld#1104010000
In the performance of this work i agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit appiication within an easement, the City strongly urges the penmit applicant to contact the easement
holder(s) and to se e any ne~ss approvals before starting such activity.
Date
g (c¡/tls-'
/
9.::zo.t/J6 -1;szf
Signature
Address 609 GROVE ST
AgenVOwner
OSHKOSH
WI 54901 - 4609
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.