HomeMy WebLinkAbout0115852-Building (siding)
e
OSHKOSH
ON THE WATER
Job Address 533 W 12TH AVE
CITY OF OSHKOSH
No
115852
BUILDING PERMIT - APPLICATION AND RECORD
Owner MATTHEW J/SHERR HELTZ
Create Date
08/19/2005
Designer
Contractor
OWNER
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
------.2 Sq. Ft.
------.2 Sq. Ft.
Rooms
Height
0 Ft.
D Projection I
Finished/Living
Bedrooms 0
Stories
Canopies 0
Garage
------.2 Sq. Ft.
Baths
Signs
------.2
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units ~
# Structures
0
Use/Nature SFR/Replace existing siding on house with vinyl. Install new gutters & downspouts. . Electric not applicable -lights not affected. NO
of Work STRUCTURAL WORK.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
Issued By: r
$8,200.00 Plan Approval
$0.00 Permit Fee Paid
$68.00 Park Dedication
$0.00
Date 08/19/2005
Final/O.P, 00/00/0000
D Permit Voided I
Parcelld # 1301520000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonn the work
described in this permit appli ion within an easement, the City stron91y urges the permit applicant to contact the easement
holder(s) and to secure a essary, pProvals before starting such activity.
Signature
Agent/Owner
Oshkosh
Dateg'- / '1-05
Address
WI 54901 - 0000
Telephone Number '2QO-30s-;/,.?Ç()
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.