HomeMy WebLinkAbout0115831-Building (kitchen remodel)
~G
OSHKOSH
ON THE WATER
Job Address 2380 FALL CREEK LN
CITY OF OSHKOSH
No
115831
BUILDING PERMIT - APPLICATION AND RECORD
OWner NANCY L DIRLAM
Create Date
08/1812005
Designer
Contractor
PORTSIDE BUILDERS, INC,
Categooy
140 - Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy 0 Fence 0 Raze
Class of Const:
Rooms 0 Height 0 Ft.
Bedrooms 0 Stories
Baths 0
Size
Zoning
Unfinished/Basement
------.2 Sq, Ft.
------.2 Sq. Ft.
0 Projection I
Canopies 0
Finished/Living
Garage
------.2 Sq, Ft.
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Park Dedication
Flood Plain
Height Permit
# Dwelling Units --2
# Structures
--2
Use/Nature
of Work
FR/ Remodeling the kitchen. new cabinets and flooring. No walls are being moved.
HVAC Contractor
Plumbing Contractor
PLUFF PLUMBING
Electric Contractor
ZIMMER ELECTRIC INC
Fees: Valuation dI $30,225.00 Plan Approval
Issued By: lA.-
$0.00 Permit Fee Paid
$157.00 Park Dedication
$0.00
Date 08/18/2005
Final/D.P. 00/00/0000
0 Permit Voided I
Parcelld # 0614404300
In the performance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s} and to~secu(~sary a~efore starting such activity.
Signature ....' /"~ Date ~/Õ-Of
~ Agent/Owner (
Address 980 AMERICAN DR
NEENAH
WI 54956 - 0000
Telephone Number
920-727-4874
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.