Loading...
HomeMy WebLinkAbout0115831-Building (kitchen remodel) ~G OSHKOSH ON THE WATER Job Address 2380 FALL CREEK LN CITY OF OSHKOSH No 115831 BUILDING PERMIT - APPLICATION AND RECORD OWner NANCY L DIRLAM Create Date 08/1812005 Designer Contractor PORTSIDE BUILDERS, INC, Categooy 140 - Interior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Class of Const: Rooms 0 Height 0 Ft. Bedrooms 0 Stories Baths 0 Size Zoning Unfinished/Basement ------.2 Sq, Ft. ------.2 Sq. Ft. 0 Projection I Canopies 0 Finished/Living Garage ------.2 Sq, Ft. Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Park Dedication Flood Plain Height Permit # Dwelling Units --2 # Structures --2 Use/Nature of Work FR/ Remodeling the kitchen. new cabinets and flooring. No walls are being moved. HVAC Contractor Plumbing Contractor PLUFF PLUMBING Electric Contractor ZIMMER ELECTRIC INC Fees: Valuation dI $30,225.00 Plan Approval Issued By: lA.- $0.00 Permit Fee Paid $157.00 Park Dedication $0.00 Date 08/18/2005 Final/D.P. 00/00/0000 0 Permit Voided I Parcelld # 0614404300 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s} and to~secu(~sary a~efore starting such activity. Signature ....' /"~ Date ~/Õ-Of ~ Agent/Owner ( Address 980 AMERICAN DR NEENAH WI 54956 - 0000 Telephone Number 920-727-4874 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.