HomeMy WebLinkAbout2005-Building (foundation)
e
OSHKOSH
ON THE WATER
Job Address 1961 S WASHBURN ST
CITY OF OSHKOSH
No
115810
BUILDING PERMIT. APPLICATION AND RECORD
Owner
Create Date
08/17/2005
Designer
Gries
Contractor
GANTHER CONSTRUCTION
Category
230 - New Stores & Customer Service
Plan P8-60-0806
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
C-2
Class of Const: VB
Size 4858 sq ft
Unfinished/Basement
----.2 Sq. Ft.
----.2 Sq. Ft.
Rooms 0 Height 0 Ft.
Bedrooms 0 Stories 1
Baths 0
0 Projection I
Finished/Living
Canopies 0
Garage
----.2 Sq. Ft.
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Not Required
Flood Plain ~
# Dwelling Units 0
Height Permit Not Required
Park Dedication
# Structures
~
Use/Nature Comm / FOUNDATION ONLY - No above grade work will be permitted until additional permits are obtained after drainage plan and
of Work landscape plan have been approved.
HVAC Contractor
Plumbing Contractor
Electric Contractor
$18.494.00 Plan Approval
$0.00 Permit Fee Paid
$159.00 Park Dedication
$0.00
Issued By:
Date 08117/2005
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld #
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
:~~::::~ndto,~n7.7;p:sbeforestartingSUchactiVity. Date ?{-/7-d)
7 Agent/OWner
Address 4825 CTY TRK A OSHKOSH
WI 54901 - 0000
Telephone Number
426-4774
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at thè time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.