HomeMy WebLinkAbout0115817-Building
e
OSHKOSH
ON THE WATER
Job Address 100 W FERNAU AVE
CITY OF OSHKOSH
BUILDING PERMIT -APPLICATION AND RECORD
No
115817
Owner LAKESIDE PACKAGING PLUS INC
Create Date
08/11/2005
Designer
Gries
Contractor
MIRON CONSTRUCTION CO INC
Category
211 - Alteration Industrial
Plan PE>-54-0705
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const: 2B
Size
Unfinished/Basement
~Sq.Ft.
~Sq.Ft.
Rooms
0
Height 0 Ft.
0 Projection I
Finished/Living
Bedrooms 0
Stories
Canopies
Garage
~Sq.Ft.
Baths
0
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Required
Not Required
Flood Plain ~
# Dwelling Units
Height Permit Not Required
Park Dedication
# Structures
~
UseiNature IND/ Interior alterations of 8405 sq It as per plans.
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
,000.00 Plan Approval
$0.00 Permit Fee Paid
$466.00 Park Dedication
$0.00
Issued By'
Date 08117/2005
Final/O.P. 00/00/0000
0 PennitVoided I
Parcelld # 1519601800
In the performance of this work I agree to perfonn all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it Is not a party, if you perfonn the work
described in this pennit application within an easement, the City strongly urges the pennit applicant to contact the easement
holder(s) and t c any necessary approvals before starting such activity.
Date 8-~ 7-05"'
Signature
Address PO BOX 509
Agenl/Owner
NEENAH
WI 54957 - 0509
Telephone Number
920-969-7053
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.