Loading...
HomeMy WebLinkAbout0115813-Building (driveway) .,0 OSHKOSH ON THE WATER Job Address 807 BAY SHORE DR CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD No 115813 Owner JEFFREY D/LAURA TODD Create Date 08117/2005 Designer Contractor UNLICENSED - UNKNOWN Category 256 - Parking Lots, Driveways Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Class of Const: Rooms 0 Height 0 Ft. Bedrooms 0 Stories Baths 0 Size Zoning Unfinished/Basement ~Sq,Ft. ~Sq,Ft. D Projection I Finished/Living Canopies 0 Garage ~Sq.Ft. Signs ~ Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Not Required # Dwelling Units ~ # Structures 0 Park Dedication Use/Nature SFRI AFTER THE FACT - concrete driveway as per plan - area located along side of garage is not to be used for parking. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation 2,000.00 Plan Approval $0.00 Permit Fee Paid $26.00 Park Dedication $0.00 Issued By: Dale 08/17/2005 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 0805870500 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. Whiie the City of Oshkosh has no autihority to enforce easement restrictions of which it is not a party, if you perform tihe work described in this permit appiication witihin an easement, the City strongly urges the permit appiicant to contact tihe easement holder(s) and to secure any necess ap ro is efore starting such activity. Date ff -I7-(} r;' Agent/Owner OSHKOSH WI 54901 - 5401 Telephone Number Signature Address 807 BAY SHORE DR To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.