HomeMy WebLinkAbout0115813-Building (driveway)
.,0
OSHKOSH
ON THE WATER
Job Address 807 BAY SHORE DR
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
No
115813
Owner JEFFREY D/LAURA TODD
Create Date
08117/2005
Designer
Contractor
UNLICENSED - UNKNOWN
Category
256 - Parking Lots, Driveways
Plan
Type
. Building
0 Sign
0 Canopy 0 Fence 0 Raze
Class of Const:
Rooms 0 Height 0 Ft.
Bedrooms 0 Stories
Baths 0
Size
Zoning
Unfinished/Basement
~Sq,Ft.
~Sq,Ft.
D Projection I
Finished/Living
Canopies 0
Garage
~Sq.Ft.
Signs
~
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain No
Height Permit Not Required
Not Required
# Dwelling Units ~
# Structures
0
Park Dedication
Use/Nature SFRI AFTER THE FACT - concrete driveway as per plan - area located along side of garage is not to be used for parking.
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
2,000.00 Plan Approval
$0.00 Permit Fee Paid
$26.00 Park Dedication
$0.00
Issued By:
Dale 08/17/2005
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 0805870500
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
Whiie the City of Oshkosh has no autihority to enforce easement restrictions of which it is not a party, if you perform tihe work
described in this permit appiication witihin an easement, the City strongly urges the permit appiicant to contact tihe easement
holder(s) and to secure any necess ap ro is efore starting such activity.
Date ff -I7-(} r;'
Agent/Owner
OSHKOSH
WI 54901 - 5401
Telephone Number
Signature
Address 807 BAY SHORE DR
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.