HomeMy WebLinkAbout0115788-Building (roof)
~
OSHKOSH
ON THE WATER
Job Address 821 HURON AVE
CITY OF OSHKOSH
No
115788
BUILDING PERMIT - APPLICATION AND RECORD
OWner EVERETT/GAIL ZELLMER
Create Date
08/16/2005
Designer
Contractor
OWNER
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ~Sq.Ft. Rooms Height 0 Ft.
Finished/Living ~Sq.Ft. Bedrooms 0 Stories
Garage ~Sq.Ft. Baths 0
0 Projection I
Canopies
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
OOlller
Occupancy Permit
Flood Plain
Height Permit
# Dwelling Units -----.!1
# Structures
-----.!1
Park Dedication
Use/Nature r:;FR / TEAR OFF AND REPLACE EXISTING ROOFING ON HOUSE & GARAGE, NO STRUCTURAL CHANGES
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$4,600.00 Plan Approval
/I¡"~
$0.00 Permit Fee Paid
$44.00 Park Dedication
$0.00
Issued By:
Date 08/16/2005
Final/D.P. 00/00/0000
0 Permit Voided I
Parcelld # 1510910000
In the performance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongiy urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature ~ Þ:1':fš ;J f7 ~
AgenUOwner
Address 821 HURON AVE
OSHKOSH
WI 54901 - 3076
Date yjiS/DS
920-
Telephone Number Z. if >-3 0 <f.2.
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.