HomeMy WebLinkAbout0115799-Plumbing (remodel)
~
OSHKOSH
ON THE WATER
Job Address 522W6THAVE
Contractor O'NEILL ENTERPRISE INC
CITY OF OSHKOSH
No
115799
PLUMBING PERMIT - APPLICATION AND RECORD
Owner DUMKE & ASSOCIATES LLC
Create Date 08/15/2005
Category 440 - Industrial-Interior
Plan
Bathtub 0 Shower 1 Water Sollner ~ Wait.St. 0 Shamp Sink 0
Whirlpool 0 Floor Drain ~ Local Waste ~ Ice Chest 0 Flr/Wst Sink 0
Lavatory 2 Lndry Tray ~ Clothes Wshr 0 Exam Sink 0 Catch Basin ~
Toilet ---1 Disposal ~ Bidet ~ Sculry Sink 0 Wash Ftn 0
Res. Sink 1 Dishwasher ~ BeerTap ~ Hand Sink 0 Urinal ~
Bar Sink 0 Sump Pump ~ Lab Sink ~ Plaster Sink 0 Standp Rec ~
Water Heater ---.1 Classrm Sink ~ Sterilizer ~ Surgeons Sink 0 Ice Maker ~
Site Drain 0 Breakrm Sink 0 Dip Well ~ F Prep Sink 0 Gar Drain 0
Roof Drain ~ Ejector/Grind ~ Drink Ftn 0 Serv Sink 0 Soda Disp ~
Misc. ~
Fixtures
Coffee Maker ~
Int Grease Trap ~
Ext Grease Trap ~
RPZValve 0
Eye Wash Statn 0
Wtr Sewer Mtrs 0
Deduct Meters 0
Wtr Usage Mtrs 0
Use/Nature
of Work
Remodle for industrial use (Debit Account)
Size Material Type # Conn. Type
Sanitary Sewer 4" Plastic Lateral 1 New
0
0
0
0
Storm Sewer 0
0
0
0
0
Water Service 1.5" Plastic Lateral 1 New
0
0
0 Parcelld #
0 0600510000
Valuation
$7,000.00
Plan Approval
$0.00
Permit Fees
$149.00 0 Permit Voided I
Issued By
Date 08/16/2005
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described In this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 5575 CTY RD N
AgenUOWner
PICKETT
WI 54964 - 0000
Telephone Number
920-428-4700 589-:
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.