Loading...
HomeMy WebLinkAbout0115761 B e CITY OF OSHKOSH No 115761 OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 2708 STONEY BEACH ST Owner MARK/DEBORAH ROLFING REV TRUST Create Date 08115/2005 Designer Contractor TOM WilLIAMS BUILDING CONTRACTOR Category 140 - Interior Remodeling Plan Type . Buiiding 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. ~Sq.Ft. Rooms 0 Height 0 Ft. 0 Projection I Canopies Finished/Living Bedrooms 0 Stories Garage ~Sq.Ft. Baths Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain ~ # Dwelling Units ----.<> Height Permit Park Dedication # Structures ~ Use/Nature SFRI Replace kitchen cabinets and add a door at the top of the stairs (swing over hallway). of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $5,000.00 Plan Approval $0.00 Permit Fee Paid $44.00 Park Dedication $0.00 Issued By: ~ Date 08/15/2005 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 1414770000 In the perfonmance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, ilyou perfonm the work described in this penmit application within an easement, the City strongly urges the permit applicant to contact the easement hoider(s) and to secure any necessary pr als befor fling such activity. Signature x Date '( ><-15-rK'" OSHKOSH ~ 54902 - 0000 Telephone Number 233-7817 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.