HomeMy WebLinkAbout0115758-Building (roof & siding)
e
OSHKOSH
ON THE WATER
Job Address 316 W SOUTH PARK AVE
CITY OF OSHKOSH
No
115758
BUILDING PERMIT. APPLICATION AND RECORD
Owner DAVID J/MELISSA KASPER
Create Date
08/15/2005
Designer
Contractor
OWNER
Category
~Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canop¥_O Fence
0 Raze
Zoning
Class of Const:
Size
_.,,-
---
Finished/Living
~Sq.Ft.
~Sq,Ft.
Rooms
0
Height
0 Ft.
D Projection I
Unfinished/Basement
Bedrooms
Stories
Canopies
Garage
~Sq.Ft.
Baths
~-_.-
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units ~
# Structures
0
Use/Nature FRITear off and replace roofing on garage. Replace wood siding with vinyl on house and garage. NO STRUCTURAL CHANGES.
of Work Property recently purchased by Jason D. Gilkes.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$2,300.00 Plan Approval
$0.00 Permit Fee Paid
$32.00 Park Dedication
$0.00
Issued By:
Date 08/15/2005
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 0904070000
In the perfonmance of this work I agree to perfonm all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this penmit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to s re any necessary a vals before starting such activity.
Date £-/1 S/{) 5
Agent/Owner
OSHKOSH
V\'I. 54902 ,6567 Telephone Number {,Ó(f]' Ô;;; 6 c¿;;
Address
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.