Loading...
HomeMy WebLinkAbout0115772-HVAC (furnace; a/c) ~ OSHKOSH ON THE WATER Job Address 456 W 11TH AVE CITY OF OSHKOSH No 115772 HVAC PERMIT . APPLICATION AND RECORD OWner ROGER/LISABETH STADLER Create Date 08/1512005 Plan Category 502 - Residential-Both I I Electric I I Solar I I Solid Contractor PREMIUM AIR INC Fuel 1"'1 Gas System n New ~ Forced Air I I Electric Chimney Type K) Chimney A Heat Loss U As Approved BTU Rate K) As Per Plan I I Oil I [71 Replace U Steam I I Suppl. . Direct Vent n Other ~ IVC I U Vent I I Can. Bumer I ( ) Not Applicable U Radiant I I Hot Water ( ) Chimney B . Existing ( ) Variabie ( ) Not Applicable . Other Value 0 Value Use/Nature f"FR/ Replace furnace and IVC -EIV provided by JK Electric - NO chimney liner being InsJalied Where an appliance is permanently of Work isconnected from an existing chimney or vent (CN), the CN shall be resized as necessary to control flue gas condensation in the Interior pf the CN and to provide the appliance or appliances served with the req. draft. Fees: Valuation $7,426.00 Plan Approval $0.00 Permit Fee Paid $117.50 Issued By: Date 08115/2005 0 Permit Voided I Parcelld # 0906440000 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to conJact the easement holder(s) and to secure any necessary approvals before sJarting such activity. Signature Date Agent/Owner Address N3225 HWY 15 HORTONVILLE WI 54944-0 Telephone Number 920-982-3323 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Penmit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.