HomeMy WebLinkAbout0115772-HVAC (furnace; a/c)
~
OSHKOSH
ON THE WATER
Job Address 456 W 11TH AVE
CITY OF OSHKOSH
No
115772
HVAC PERMIT . APPLICATION AND RECORD
OWner
ROGER/LISABETH STADLER
Create Date 08/1512005
Plan
Category 502 - Residential-Both
I I Electric
I I Solar
I I Solid
Contractor PREMIUM AIR INC
Fuel 1"'1 Gas
System n New
~ Forced Air
I I Electric
Chimney Type K) Chimney A
Heat Loss U As Approved
BTU Rate K) As Per Plan
I I Oil
I
[71 Replace
U Steam
I I Suppl.
. Direct Vent
n Other
~ IVC I U Vent
I I Can. Bumer I
( ) Not Applicable
U Radiant
I I Hot Water
( ) Chimney B
. Existing
( ) Variabie
( ) Not Applicable
. Other
Value
0
Value
Use/Nature f"FR/ Replace furnace and IVC -EIV provided by JK Electric - NO chimney liner being InsJalied Where an appliance is permanently
of Work isconnected from an existing chimney or vent (CN), the CN shall be resized as necessary to control flue gas condensation in the Interior
pf the CN and to provide the appliance or appliances served with the req. draft.
Fees: Valuation
$7,426.00
Plan Approval
$0.00
Permit Fee Paid
$117.50
Issued By:
Date 08115/2005
0 Permit Voided I
Parcelld # 0906440000
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to conJact the easement
holder(s) and to secure any necessary approvals before sJarting such activity.
Signature
Date
Agent/Owner
Address
N3225 HWY 15
HORTONVILLE
WI 54944-0
Telephone Number
920-982-3323
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Penmit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.