Loading...
HomeMy WebLinkAbout0115743-Building (siding) ~ OSHKOSH ON THE WATER Job Address 312 HUDSON AVE CITY OF OSHKOSH No 115743 BUILDING PERMIT - APPLICATION AND RECORD Owner JEAN ZELLNER Create Date 08/12/2005 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~Sq.Ft. Bedrooms 0 Stories Garage ~Sq.Ft. Baths 0 0 Projecton I Canopies 0 Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures ~ Use/Nature SFRI Installing new siding on the house. No structural work or eiectricai fixtures to be moved or replaced. The contractor is Steve Wirtz. of Work HVAC Contractor Plumbing Contractor Electric Contractor $10,932.00 Plan Approval $0.00 Permit Fee Paid $79.00 . Park Dedication $0.00 Fees: Valuation Issued By: ~ Date 08/12/2005 Final/D.P. 00/00/0000 0 Permit Voided I Parcelld # 0403530000 In the performance of this work I agree to perform ail work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit appiication within an easement, the City strongly urges the permit appiicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature )<.. :J.t;¿¡~ £- ~.æ.t>ß/>1ß1..--' Agent/Owner OSHKOSH Date }("(J'(Jj:1JDf- WI 54901 - 4912 Telephone Number 13 T -8 '13 '7 Address 312 HUDSON AVE To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.