HomeMy WebLinkAbout0115743-Building (siding)
~
OSHKOSH
ON THE WATER
Job Address 312 HUDSON AVE
CITY OF OSHKOSH
No
115743
BUILDING PERMIT - APPLICATION AND RECORD
Owner JEAN ZELLNER
Create Date
08/12/2005
Designer
Contractor
OWNER
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft.
Finished/Living ~Sq.Ft. Bedrooms 0 Stories
Garage ~Sq.Ft. Baths 0
0 Projecton I
Canopies 0
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units 0
# Structures
~
Use/Nature SFRI Installing new siding on the house. No structural work or eiectricai fixtures to be moved or replaced. The contractor is Steve Wirtz.
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
$10,932.00 Plan Approval
$0.00 Permit Fee Paid
$79.00 . Park Dedication
$0.00
Fees: Valuation
Issued By:
~
Date 08/12/2005
Final/D.P. 00/00/0000
0 Permit Voided I
Parcelld # 0403530000
In the performance of this work I agree to perform ail work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit appiication within an easement, the City strongly urges the permit appiicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature )<.. :J.t;¿¡~ £- ~.æ.t>ß/>1ß1..--'
Agent/Owner
OSHKOSH
Date }("(J'(Jj:1JDf-
WI 54901 - 4912 Telephone Number 13 T -8 '13 '7
Address 312 HUDSON AVE
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.