Loading...
HomeMy WebLinkAbout0115367-Building (replace existing asphalt) e OSHKOSH ON THE WATER Job Address 913-919 NEBRASKA ST CITY OF OSHKOSH No 115367 BUILDING PERMIT - APPLICATION AND RECORD Owner GRACE EVAN LUTHERAN CHURCH Create Date 07/22/2005 Designer Contractor FOX VALLEY ASPHALT Category 256 - Parking Lots, Driveways Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ----.2 Sq. Ft, Rooms 0 Height 0 Ft. Finished/Living ----.2 Sq, Ft,. Bedrooms 0 Stories Garage ----.2 Sq, Ft, Baths 0 Projection I Canopies ----.2 Signs ----.2 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit # Dwelling Units 0 # Structures 0 Park Dedication Use/Nature COMM/ Removing existing asphalt and replacing it per the site plan submitted. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $2,325.00 Plan Approval $0.00 Permit Fee Paid $32.00 Park Dedication $0.00 Issued By: Date 07/22/2005 FinaIlO,P, 00/00/0000 0 Permit Voided I Parcelld # 0301650000 In the performance of this work I agree to perform ail work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement ~~~d:~::::nd to secure any ~:;;ssary approval fore startin~ such activity. Date 7/¿:;,7' /{Jç Address 7526 STATE HWY 45 NEENAH WI 54956 .0000 Telephone Number 722-8222 OR 1-800-, To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le, Footing, Service, Final, etc,), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received, Work may continue ifthe inspection is not performed within two business days from the time the project is ready, ~. l\) - ~ \J tv> I;J v ~ J I \,V\ ~~ Ci:¡ * I ç ~,~ :) ~ ~ \ ~~ ~~ <I. .y, .. ~ (,. ~ 1- ...-cJ --' ø C"'> cr- j J¡; 41 -t 0/ ~ ~ ~ J Qh~ "" I-,.¡ i ~. /o-f'~ ~.~ . . , \ .$ >' V' ..- 1; \I ._'~ s; ù ~ . --".... . --...~...~-