HomeMy WebLinkAbout2005-Building (sign)
e
OSHKOSH
ON THE WATER
Job Address 3001 S WASHBURN ST
CITY OF OSHKOSH
No
115045
BUILDING PERMIT - APPLICATION AND RECORD
Owner FIRST HORIZON GROUP LIMITED PTNSHP
Create Date
07/07/2005
Designer
Contractor
BECK SIGNS
Category
254 - Signs
Plan
Type
0 Building
. Sign
0 Canopy 0 Fence 0 Raze
Class of Const: Size
Rooms Height 0 Ft. 0 Projection I
Bedrooms 0 Stories Canopies 0
Baths Signs
0 Pier 0 Other
0 Treated Wood
Flood Plain No Height Permit Not Required
# Dwelling Units 0 # Structures 0
Zoning
Unfinished/Basement
~Sq.Ft.
~Sq.Ft.
Finished/Living
Garage
~ Sq. Ft.
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
Occupancy Permit Not Required
Park Dedication
Not Required
Use/Nature Suite D110 - "Maurices" -Install wall sign as per plan - wiring being done by on site electrician.
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
,850.00 Plan Approval
$0.00 Permit Fee Paid
$44.00 Park Dedication
$0.00
Issued By:
Date 07/07/2005
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 1329420000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit appiication within an easement, the City strongly urges the permit appiicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 2269 ALLERTON DR
AgenUOwner
OSHKOSH
WI 54904 - 0000
Telephone Number
920-231-1160
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.