Loading...
HomeMy WebLinkAbout0115740 B e OSHKOSH ON THE WATER Job Address 257 W SOUTH PARK AVE CITY OF OSHKOSH No 115740 BUILDING PERMIT - APPLICATION AND RECORD Owner DAVID F NIMKE Create Date 08/11/2005 Contractor OWNER Designer Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy Class of Const: 0 Fenee 0 Raze Zoning Size Unfinished/Basement ---.!! Sq. Ft. ---.!! Sq. Ft. Rooms Height 0 Ft. 0 Projection I Finished/Living Bedrooms Stories Canopies 0 Garage ---.!! Sq. Ft. Baths 0 Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit # Dwelling Units 0 # Structures -----2 Park Dedication Use/Nature of Work FR / TEAR OFF AND REPLACE EXISTING ROOFING ON FRONT PORCH. NO STRUCTURAL CHANGES HVAC Contractor Plumbing Contractor Electric Contractor $300.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Fees: Valuation Issued By: A-4.1J Date 08/11/2005 Final/O.P. 00/00/0000 0 Permit Voided 1 Parcelld # 0901460000 In the perfonmanee of this work I agree to perfonm all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforee easement restrictions of which it is not a party, if you perfonm the work described in this penmit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting su activity. n - Date ,f / // //J.s- /7 Signature Address 257W SOUTH PARK AVE OSHKOSH WI 54902 - 6537 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.