Loading...
HomeMy WebLinkAbout0115711-Building (windows) e OSHKOSH ON THE WATER Job Address 1529 EVANS ST CITY OF OSHKOSH No 115711 BUILDING PERMIT - APPLICATION AND RECORD Owner ANDREA J KISLEY Create Date 08/10/2005 Designer Contractor WASCO. WISCONSIN ALUMINUM SUPPLY C( Category 141 . Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.FI. ~Sq.FI. Rooms Height 0 FI. D Projection I Canopies 0 Finished/Living Bedrooms 0 Stories Garage ~Sq.Ft. Baths 0 Signs ~ Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units 0 # Structures 0 Use/Nature ofWork FRllnstall 7 double hung. and 1 slider window in existing openings. NO STRUCTURAL WORK! HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $3.565.00 Plan Approval $0.00 Permit Fee Paid $38.00 Park Dedication $0.00 Issued By: Date 08110/2005 FinaI/O.P. 00100/0000 D Permit Voided I Parcelld # 1511750000 In the performance of this work I agree 10 perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before stamng such activity. Signature Date Address 2546 AMERICAN DR AgenUOwner APPLETON WI 54914 - 0000 Telephone Number 920-730-0099 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing. Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.